The modernization project focused on upgrading the knife shaft drive system of the Alpina Swopper V200 cutter, transitioning its power supply from DC to AC. The cutter is designed for high-capacity raw material processing, grinding large meat pieces into a uniform minced mass. Its performance is directly dependent on the bowl capacity, which in this case is 200 liters.

Project information:
Modernization of the cutter knife shaft electric drive system Alpina Swopper V200 with conversion of power supply from direct current to alternating current.

Industry:

Food Processing (Meat)

Customer:

LLC "PIK I K" TM "Myasnyi Ryad"

Date:

August 2021

The main goals of the project are:

  • Significant wear of the Baumueller GNA 160 SN DC motor, reaching the end of its service life.
  • Lack of spare parts, making maintenance and repairs unfeasible.
  • Frequent failures and downtime, leading to production losses.
  • Irreparability of the existing DC motor and economic inefficiency of further operation.

Composition of the system's hardware:

  • Baumueller DA160MO23R AC asynchronous motor (selected and installed as a direct replacement for the existing DC motor).
  • Danfoss FC-302N110T5E20 frequency converter.
  • Rittal electrical cabinet for housing control components.
  • Low-voltage switching equipment from Eaton and Phoenix Contact, with Lapp cabling solutions.
  • Inspection and potential repair of mechanical components.
  • Assembly of the motor control cabinet with frequency converter integration.
  • Installation and commissioning of the new AC drive system.

Results:

  • Seamless integration – the new AC drive system fully replicates the technical characteristics of the previous DC system without modifications to the cutter’s operation or operator interface.
  • Elimination of continuous maintenance requirements, a major drawback of the old DC motor.
  • Extended equipment lifespan and improved system reliability.
  • Minimized production losses due to elimination of unplanned downtime caused by motor failures.