Project
Installation and assembly of a cable line for the power unit of longitudinal graphitization furnaces
Technological object: Reconstruction of workshop No. 6 with the arrangement of longitudinal graphitization furnaces, furnace power unit.
Project information:
Industry:
Chemical industr
Customer:
Private Joint Stock Company "Ukrainian Graphite"
Date:
2017
The main goals of the project are:
- Providing power for a mobile unit on a 66-meter section.
- Ensuring reliable connection of the unit to the existing workshop automation system for control.
- Avoiding unreliable suspension structures.
Composition of the system's hardware:
- Cable chain Lapp: SILVYN CHAIN
- Cable OLFLEX CLASSIC
- Cable HITRONIC TORSION
- Cable KGNB
Results:
- Reliable power supply for the mobile unit has been provided on a 66-meter section.
- Guaranteed durability of the cable system due to its protection and lack of friction.
- Efficient use of installation space – the cable chain does not create obstacles for work in the workshop.
- Easy access to the system is provided for quick cable replacement in case of emergencies.