Interest in Battery Energy Storage Systems (BESS) continues to grow as industrial companies seek greater energy resilience and operational flexibility. Businesses are evaluating energy storage as a backup power source, a tool for integrating on-site generation, reducing peak demand, or improving the reliability of critical production processes. As a result, an increasing number of investment proposals present convincing business cases. Battery capacity has been calculated, return on investment has been estimated, and projected savings are illustrated in detailed financial models. However, a well-prepared financial model does not necessarily mean that the system has been correctly engineered or that it will perform as expected under real operating conditions. A Battery Energy Storage System is far more than a battery connected to an electrical network. It is a complex electrical system comprising battery modules, a Power Conversion System (PCS), a Battery Management System (BMS), an Energy Management System (EMS), switching equipment, protection devices, cooling systems, fire protection, and communication infrastructure. Its performance depends on the characteristics of the electrical load, the condition of the existing power distribution system, and the control algorithms governing its operation. For this reason, investment decisions should be based on more than equipment cost and projected ROI alone. Below are seven warning signs indicating that a BESS business case deserves a more comprehensive technical assessment.

1. The BESS was selected before the problem was clearly defined

One of the most common warning signs appears when a project begins with a statement such as: “We need a 500 kWh battery.”  The obvious question is: Why 500 kWh?

What operational challenge is this capacity intended to solve? For one facility, the primary objective may be maintaining power to critical loads during a grid outage. For another, it may be reducing short-duration demand peaks. A third facility may require optimized operation alongside a photovoltaic system or diesel generator. Although these applications all involve energy storage, they require fundamentally different system configurations.

Backup power applications depend on:

  • critical load demand;
  • acceptable transfer time;
  • required autonomy;
  • restoration strategy.

Peak shaving projects require analysis of:

  • peak demand profile;
  • peak duration;
  • frequency of occurrence.

Applications involving renewable generation depend on balancing:

  • on-site generation;
  • electrical consumption;
  • battery charging opportunities.

A battery capacity suitable for one application may be entirely inappropriate for another. A professional techno-economic assessment should therefore begin with the operational objective—not with a product catalogue or an investment budget.

Key questions include:

  • Which loads must be supported?
  • What power output is required?
  • For how long?
  • Under which operating modes?
  • How frequently will the system operate?
  • What constitutes a successful outcome?

Load profiles—both with and without energy storage—are among the most important inputs for a meaningful economic assessment. Without a clearly defined objective, selecting battery capacity becomes little more than an educated guess.

2. Calculations are based on average consumption instead of the actual load profile

Suppose a facility consumes 400 kWh over the course of one hour. This does not mean that its electrical demand remained constant at 400 kW throughout that hour. Within the same period, the facility may experience:

  • large motor starts;
  • short-duration peaks reaching 700–800 kW;
  • temporary reductions in load;
  • simultaneous operation of multiple production lines;
  • scheduled process interruptions.

Average consumption may be sufficient for electricity billing. It is not sufficient for designing a Battery Energy Storage System. The PCS must be capable of delivering the required power precisely when demand occurs. The battery must withstand the corresponding discharge current. The control system must detect rapid changes in operating conditions and respond accordingly. If the business case relies only on monthly utility bills or hourly average demand values, it may completely overlook the operating conditions that justify installing the system in the first place.

This is particularly critical when evaluating:

  • backup operation;
  • peak shaving;
  • motor starting;
  • generator support;
  • island mode operation;
  • protection of critical industrial processes.

A reliable design requires an actual power profile with sufficient measurement resolution. For some applications, 15-minute interval data may be adequate. Others require one-second measurements—or even transient analysis—to accurately capture dynamic load behaviour. An average load curve shows how much energy a facility consumes. It does not necessarily show how its electrical system actually operates.

3. The existing electrical infrastructure has not been properly assessed

Battery Energy Storage Systems are often viewed as a solution that will automatically improve a facility’s power quality and reliability. In reality, a BESS operates within the electrical infrastructure that already exists. If that infrastructure has limitations, the energy storage system cannot eliminate them. Before designing a BESS, a comprehensive assessment of the electrical network should include:

  • transformer capacity and condition;
  • incoming feeder ratings;
  • protection coordination and selectivity;
  • short-circuit current levels;
  • cable sizes and lengths;
  • condition of the main and distribution switchboards;
  • phase imbalance;
  • voltage drops;
  • grounding system performance;
  • harmonic distortion levels;
  • compatibility with on-site generation.

For example, if the incoming feeder or busbar system cannot accommodate an additional 500 kW of bidirectional power flow, installing a 500 kW PCS simply because it appears in a commercial quotation is not technically feasible. Modern Battery Energy Storage Systems can actively support voltage regulation, frequency control, and power management—provided these operating modes are supported by both the PCS architecture and the overall system design. However, a BESS cannot compensate for:

  • overloaded cables;
  • deteriorated electrical connections;
  • incorrectly coordinated protection devices;
  • undersized switchgear;
  • poor installation practices.

In many projects, integrating energy storage also requires upgrades to the existing electrical infrastructure, including new switchgear, transformer reinforcement, revised protection settings, or power limitations. These requirements should be identified before the investment budget is approved. If no electrical infrastructure audit has been carried out, the proposed project cost is unlikely to represent the true total investment.

4. The budget includes only the battery and PCS

The cost of a battery cabinet or container does not represent the total cost of implementing a Battery Energy Storage System.

A complete project budget may include:

  • power transformers;
  • medium- or low-voltage switchgear;
  • circuit breakers and disconnectors;
  • power cables;
  • Automatic Transfer Switch (ATS) equipment;
  • protection relays;
  • revenue-grade metering;
  • SCADA integration;
  • EMS integration with the existing automation system;
  • civil engineering works;
  • foundations or site preparation;
  • ventilation or HVAC systems;
  • fire detection and suppression systems;
  • engineering and design;
  • installation;
  • commissioning;
  • preventive maintenance;
  • operator training;
  • future replacement of auxiliary equipment or battery modules.

For facilities with a straightforward electrical layout and sufficient installation space, BESS integration may be relatively simple. At other sites, however, implementation may require reconstruction of the main switchboard, installation of an additional transformer, redesign of the protection system, or the installation of hundreds of metres of new power cables. For this reason, comparing proposals solely on the basis of battery cost per kilowatt-hour is misleading.

A meaningful evaluation should consider the Total Cost of Ownership (TCO), including:

  • engineering;
  • installation;
  • commissioning;
  • maintenance;
  • energy losses;
  • battery degradation;
  • replacement costs throughout the system’s service life.

Modern lifecycle cost analyses increasingly account not only for the initial capital investment but also for future battery replacement and other long-term operating expenses.

5. The Financial Model Works Only Under Ideal Conditions

Building an attractive financial projection is relatively easy.

The assumptions typically look like this:

  • electricity prices will continue to increase;
  • the battery will complete the planned number of charge-discharge cycles every day;
  • there will be no unexpected downtime;
  • battery degradation will remain at its minimum projected level;
  • the facility’s operating profile will not change;
  • the full battery capacity will always be available;
  • no unforeseen maintenance costs will occur.

Real industrial facilities rarely operate under such ideal conditions. Production schedules change. Electricity tariffs fluctuate. Load profiles evolve. Generation assets are modified. Battery availability may be limited by state-of-charge (SOC) constraints, ambient temperature, operating strategies, or measures designed to preserve battery lifetime. A robust financial model should therefore include at least three scenarios.

Base Case The most realistic operating scenario based on current production conditions.

Optimistic Case Higher system utilization, favourable operating conditions, and maximum projected savings.

Conservative Case Lower cycle frequency, reduced savings, faster battery degradation, additional maintenance costs, or changes in plant operation.

Sensitivity analysis should also evaluate how project economics change when key assumptions vary, including:

  • electricity prices;
  • annual cycle count;
  • allowable depth of discharge;
  • round-trip efficiency;
  • battery degradation rate;
  • maintenance costs;
  • service life;
  • cost of production downtime.

If a relatively small change in one assumption completely eliminates the projected economic benefit, the business case cannot be considered robust.

6. “The BESS will generate revenue” is not a business model

A Battery Energy Storage System can undoubtedly create economic value. It can shift energy consumption to more favourable tariff periods, reduce peak demand charges, increase the utilization of on-site renewable generation, and provide grid support services where technical and market conditions allow. However, for most industrial facilities, the true value of a BESS is not necessarily derived from selling electricity or participating in energy markets. In many cases, its greatest benefit lies elsewhere. For example:

  • a critical production process continues operating during a power outage;
  • valuable products are not lost;
  • manufacturing equipment completes its operating cycle safely;
  • diesel generators avoid prolonged operation at low load;
  • emergency shutdowns are prevented;
  • production continues despite grid power limitations.

These benefits are much harder to represent in a simple return-on-investment calculation. Yet they are often the primary reason for investing in energy storage. For many industrial processes, a single hour of downtime can cost significantly more than an entire year’s savings from electricity tariff optimization. In such cases, the Battery Energy Storage System is installed not to maximize energy arbitrage, but to reduce operational risk and improve business continuity. Around the world, Battery Energy Storage Systems are playing an increasingly important role in improving power system flexibility and resilience. Nevertheless, the financial outcome always depends on the specific application, system architecture, and integration strategy. Simply stating that “the BESS will generate revenue” without clearly explaining the source of that value is not a business model. A credible business case should clearly explain:

  • where the economic benefit comes from;
  • how that benefit will be measured;
  • under which operating conditions it can be maintained;
  • which technical limitations may reduce or eliminate it.

7. Payback period should not be the only decision criterion

Payback period is undoubtedly an important financial indicator. However, it should never be the only criterion for evaluating a system that directly affects the reliability of an entire industrial facility. A comprehensive business case should also answer critical technical questions, including:

  • Which loads will the system support?
  • What backup duration is guaranteed?
  • Can it start the required motors or equipment?
  • What happens during a complete grid outage?
  • Does the system support island mode operation?
  • How will it interact with diesel generators and photovoltaic systems?
  • How much power remains available at different battery State of Charge (SOC) levels?
  • How will usable battery capacity change over its service life?
  • Which operating conditions affect the manufacturer’s warranty?
  • What happens if one battery module or converter fails?
  • How are diagnostics, maintenance, spare parts, and technical support organized?
  • What procedures should operating personnel follow during emergency situations?

Payback period answers none of these questions. Moreover, for backup power applications, traditional ROI calculations may fail to reflect the system’s true value. If the primary objective is to prevent a rare—but potentially catastrophic—production shutdown, project justification should be based on risk mitigation, not solely on monthly energy cost savings. A Battery Energy Storage System is not a financial instrument that automatically generates profit. It is an engineered asset with clearly defined capabilities, operating limitations, maintenance requirements, and a finite service life.

What Should a Well-Prepared BESS Business Case Include?

A professional business case should not begin with promises of payback within a certain number of years. Instead, it should systematically answer four fundamental questions.

1. Operational Objective What specific problem is the Battery Energy Storage System expected to solve? How will project success be measured?

2. Technical Feasibility Can the system deliver the required power, response time, and backup duration? Can the existing electrical infrastructure safely accommodate its integration?

3. Total Cost of Ownership What are the complete capital and operating costs throughout the system’s lifetime?

The analysis should include:

  • engineering;
  • installation;
  • commissioning;
  • maintenance;
  • battery degradation;
  • energy losses;
  • replacement of major components.

4. Project Risks

How will project economics change if:

  • electricity tariffs change;
  • production schedules change;
  • annual cycle count differs from expectations;
  • battery degradation accelerates;
  • operating conditions evolve?

Only after these questions have been answered does it make sense to determine:

  • battery capacity;
  • PCS rating;
  • system architecture;
  • EMS control strategy.

What information should be collected before performing the analysis?

A preliminary techno-economic assessment typically requires the following information:

  • single-line electrical diagram;
  • historical active and reactive power profiles;
  • list of critical loads;
  • motor starting characteristics;
  • outage frequency and duration;
  • information about standby generators and on-site generation;
  • transformer ratings and incoming feeder capacity;
  • contractual power limits;
  • required backup duration;
  • estimated cost of production downtime or product loss;
  • available installation space.

Without these data, it is possible to prepare only a preliminary commercial proposal. It is not yet possible to develop a complete techno-economic feasibility study.

Conclusion

A weak business case does not necessarily mean that an industrial facility does not need a Battery Energy Storage System. More often, it means the evaluation started from the wrong point. A proper engineering approach begins with understanding:

  • the production process;
  • the electrical load profile;
  • the condition of the electrical infrastructure.

Only then should engineers define the required operating modes, identify technical constraints, evaluate project economics, and select the appropriate equipment. Sometimes the conclusion will be that installing a Battery Energy Storage System is the right decision. In other cases, the analysis may indicate that the battery capacity or PCS rating should be revised. Occasionally, the most appropriate recommendation will be to modernize the facility’s electrical infrastructure, protection system, or automation before considering energy storage. That is what sound engineering is about. Not proving that every facility needs a Battery Energy Storage System, but determining whether it is genuinely the right technical solution for the specific application.